In short
Waterfront in Fort Lauderdale means one of four things: the ocean, the Intracoastal, a canal off it, or a river with fixed bridges. On the Intracoastal itself the bridges open. Off it, some do not. The Mercedes River bridge in Harbor Beach clears 7 feet and the Middle River bridges clear 10 feet and 8 feet.1
What the waterfront flag covers
The MLS record has one yes-or-no waterfront field, which the listing agent fills in. It does not say whether the water is the ocean, the Intracoastal Waterway, a canal or a lake, whether there is a dock, or how deep the water is. Ask for the survey, the seawall's condition and any dock permits before you make an offer.
Bridges between a dock and the ocean
Two inlets serve the area: Port Everglades at the south end and Hillsboro at mile 1053.9. By mile marker, a boat heading south from Commercial Boulevard passes the Commercial, Oakland Park, Sunrise, Las Olas and SE 17th Street draws in that order. That is our reading of the Coast Pilot's list.1
Schedules alternate. Commercial, Sunrise and SE 17th Street open on the hour and half-hour. Oakland Park and Las Olas open at the quarter and three-quarter hour. On weekdays, except federal holidays, SE 17th Street opens only at the top of the hour from 6:50 to 9:10 a.m. and from 3:50 to 6:10 p.m.2
Docks, lifts and the side-yard line
A dock may reach 25 feet or a quarter of the waterway's width, whichever is less. Piles may reach 25 feet or 30 percent. The first 100 feet of lot width earns one lift, and a site may add one for a personal watercraft. A house must stand on the lot before a dock is built.3
Length matters as much as depth. A boat may not extend past the side setback lines as they run into the water, so a narrow lot limits the boat even where the canal is wide. Covers and boathouses may not stand over a public waterway.3
Tide dates and flood zones
The City's 2026 king tide calendar has two windows left after this page was written: November 22 to 28 and December 24 to 25. The City adds that flooding can fall outside the forecast windows, so ask a seller for photographs of the street and the wall at a fall high tide.4
Researched and published by Nick McCandless · Sources checked · Methodology · Editorial policy
Sources
Third-party publications this page relies on. Numbers in the text refer to this list.
- NOAA Office of Coast Survey: U.S. Coast Pilot 4, Chapter 12: Intracoastal Waterway (November 15, 2026) (source, checked 2026-11-23)
- Code of Federal Regulations: 33 CFR 117.261, Atlantic Intracoastal Waterway drawbridges (as of November 1, 2026) (source, checked 2026-11-23)
- City of Fort Lauderdale, via Municode: ULDR Section 47-19.3, Boat slips, docks, boat davits, hoists and similar mooring structures (source, checked 2026-11-23)
- City of Fort Lauderdale: King Tides and High Tides (2026 dates) (source, checked 2026-11-23)





















































